Skip to main content

Payscale - Software Development



Skill Set
Education
Junior
Middle
Exp (Yrs)
Min. Salary
Max. Salary
Exp (Yrs)
Min. Salary
Max. Salary
SOFTWARE DEVELOPMENT
Android Developers
BE / B.Tech / Any Graduation
4-8
5.00
14.00
8-15
12.00
25.00
iPhone Developers
BE / B.Tech / Any Graduation
4-8
7.00
16.00
8-15
12.00
24.00
Java
BE / B.Tech / MCA
4-8
3.00
14.00
8-15
10.00
22.00
.NET
BE / B.Tech / MCA
4-8
3.00
11.00
8-15
11.00
19.00
C
BE / B.Tech / MCA
4-8
3.00
14.00
8-15
14.00
30.00
C++
BE / B.Tech / MCA
4-8
6.00
12.00
8-15
12.00
23.00
PHP
BE / B.Tech / Any Graduation
4-8
3.00
10.00
8-15
9.00
19.00
Embeded C
BE / B.Tech / MCA
4-8
6.00
12.00
8-15
10.00
20.00
Perl
BE / B.Tech / MCA
4-8
6.00
12.00
8-15
14.00
28.00
Python
BE / B.Tech / MCA
4-8
7.00
14.00
8-15
12.00
24.00
VB programming
BE / B.Tech / Any Graduation
4-8
4.00
8.00
8-15
10.00
15.00
VC++
BE / B.Tech / MCA
4-8
5.00
9.00
8-15
10.00
25.00
PL /SQL Developers
BE / B.Tech / MCA
4-8
4.00
9.00
8-15
9.00
20.00
Powerbuilder
BE / B.Tech / MCA
4-8
4.00
12.00
8-15
11.00
20.00
AS /400 cobol
BE / B.Tech / MCA
4-8
4.00
10.00
8-15
13.00
28.00
Flex
BE / B.Tech / MCA
4-8
4.00
11.00
8-15
10.00
23.00
Pega
BE / B.Tech / MCA
4-8
6.00
14.00
8-15
18.00
35.00
Sybase Unwired, Java,android
BE / B.Tech / MCA
4-8
8.00
16.00
8-15
15.00
30.00

Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction