Skip to main content

Pay Scale - Engineering - Power Sector




Skill Set
Education
Junior
Middle
Senior
Exp (Yrs)
Min. Salary
Max. Salary
Exp (Yrs)
Min. Salary
Max. Salary
Exp (Yrs)
Min. Salary
Max. Salary
POWER










Design Engineer
BE / Tech / Mechanical
4-6
7.00
14.00
8-14
15.00
30.00
15-20
35.00
55.00
Instrumentation Control
BE / Tech / Instrumentation
4-6
5.00
12.00
8-12
14.00
22.00
18-25
20.00
40.00
Health Safety and Environment
BE / Tech / Mechanical
3-6
5.00
14.00
7-12
12.00
28.00
18-25
50.00
70.00
Balance of Plant
BE / Tech / Electrical / Mechanical
4-6
8.00
16.00
8-10
12.00
37.00
15-20
25.00
70.00
Civil
BE / Tech / Civil
3-5
5.00
12.00
7-12
10.00
28.00
15-20
25.00
35.00
Transmission Engineer
BE / Tech / Electrical
4-6
6.50
12.00
8-12
10.00
35.00
18-25
40.00
75.00
Product Development
BE / Tech / Electronics
4-6
8.00
14.00
10-15
10.00
35.00
12-18
20.00
35.00
System Engineering
BE / Tech / Mechanical
4-9
5.00
13.00
10-15
12.00
25.00
12-18
18.00
35.00
Plant Operations
BE / Tech / Mechanical
4-6
6.00
12.00
8-14
11.00
23.00
12-18
20.00
40.00
Procurement
BE / Tech / Electrical
3-5
5.00
14.00
10-15
10.00
26.00
18-25
25.00
40.00
Installation
BE / Tech / Electrical
3-6
5.00
11.00
10-15
15.00
22.00
15-20
25.00
35.00
Project
BE / Tech / Mechanical
2-5
4.00
10.00
8-14
11.00
22.00
18-25
25.00
50.00
Supply Chain / Logistics
BE / Tech / Electrical / Mechanical
2-5
4.00
9.00
10-15
10.00
24.00
15-20
18.00
45.00
Quality
BE / Tech / Electrical / Mechanical
2-6
4.00
9.00
10-15
12.00
28.00
18-25
18.00
60.00
STG
BE / Tech / Mechanical
4-7
3.00
10.00
10-15
13.00
22.00
-
-
-
Systems Designer
Be / Tech / Diploma
3-5
3.00
8.00
-
-
-
-
-
-
Plant Inspection
Dipolma
2-5
2.00
6.00
10-15
10.00
19.00
15-20
20.00
35.00

Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction