list of India’s top Super Expressways



Here is the list of India’s top 11 Super Expressways
1) Ahmedabad Vadodara Expressway
Ahmedabad Vadodara Expressway is 95 km long and joins Ahmedabad and Baroda in Gujarat. It is also referred as National Expressway 1. This expressway was opened to public in 2004 and was constructed under the Golden Quadrilateral Project by NHAI.

2) Mumbai-Pune Expressway
Mumbai-Pune Expressway (official name is the Yashwantrao Chavan Expressway) is 93 km long and is considered as one of the best expressways in India. It is India’s first six lane high speed expressway and was made by Maharashtra State Road Development Corporation (MSRDC) at a staggering cost of Rs 1,630 crore (US$363.49 million). It was opened to public in April 2002

3) Jaipur-Kishangarh Expressway
Jaipur-Kishangarh Expressway is 90km long and it connects Jaipur with Kishangarh. It was constructed under the Golden Quadrilateral National Highways Development Project and its cost was USD 154 million. More than 20,000 vehicles pass from this highway everyday.

4) Allahabad Bypass
Allahabad Bypass covers a distance of 86 km and is one of the most remarkable achievements of the Golden Quadrilateral project. It connects India’s four main metropolians New Delhi, Kolkata, Mumbai and Chennai.

5) Ambala Chandigarh Expressway
Ambala Chandigarh Expressway covers a distance of 35 km and has reduced the traffic congestion to a much greater extent. It was opened in 2009 and was built at a cost of Rs 298 crore ($66.45 million)

6) Chennai Bypass
Chennai Bypass covers a distance of 32 km and connects four national highways (NH45, NH4, NH205 and NH5) around Chennai. The cost of this project was Rs 405 crore (Rs 4.05 billion).

7) Delhi-Gurgaon Expressway
Delhi-Gurgaon Expressway covers a distance of 28 km and has been a life saver for commuters. Before construction of this expressway huge traffic jams were seen on the roads. Though this problem has not been solved 100% but still this expressway has brought some relief to the commuters. Delhi-Gurgaon Expressway starts at Dhaula Kuan in Delhi and ends at Manesar which is on the outskirts of Gurgaon. The cost of this project was $223 million and it was opened for public use in January 2008.

8 ) Noida-Greater Noida Expressway
Noida-Greater Noida Expressway covers a distance of 24.53 km. This six-lane highway connects Noida to Greater Noida. The total cost to build this expressway is about 400 crores (Rs 4 billion).

9) Delhi Noida Direct Flyway
Delhi Noida Direct Flyway or popularly known as the DND flyway is an eight lane road having a total length of 9.2 km and connects Delhi to Noida. It was built by The Noida Toll Bridge Company Ltd.
10) Hyderabad elevated expressway
Two separate elevated expressways were to be constructed in Hyderabad to overcome the congestion problem. The first one is P.V. Narasimha Rao Elevated Expressway which covers a distance of 11.6 km and the other Rajiv Elevated Expressway which will cover the distance of 20 km. P.V. Narasimha Rao Elevated Expressway was completed in 2009 and it connects Hyderabad International Airport to Mehdipatnam. Rajiv Elevated Expressway was proposed as an extension and will cover Secunderabad-Shamirpet stretch via Karkhana, Trimulgherry and Bollarum. But this project is currently under suspension due to high project costs.

11) Hosur Road Elevated Expressway
Hosur Road Elevated Expressway covers a distance of 9.98 km and connects Bangalore to Hosur. This expressway has the distinction of becoming the tallest expressway in Bangalore at the height of 17 meters i.e. 56 ft. This project was started in 2006 by BETL and was inaugurated on 22 January 2010.





Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction